Playgrounds › Noise Schedules › Square Root Schedule
Square Root Schedule
Originating Paper
On the Importance of Noise Scheduling for Diffusion Models🧑🎓 Ting Chen
📍 arXiv 2023
📄 203 citations
Why this schedule?
The square-root schedule front-loads noise more aggressively than the linear schedule but less than exponential approaches. The curve drops steeply at the beginning—the model is quickly pushed into challenging denoising territory—then gradually levels off as approaches . This shape prioritizes learning coarse, global structure early while spending more time on the nuanced late-stage transitions. It can be seen as a compromise between the uniform pacing of linear and the delayed-difficulty approach of cosine.
Formula
- • = current timestep
- • = total number of timesteps
- • = cumulative signal retention
1.00001.00000.0000∞
across all schedules
LinearCosineSigmoidExponentialCauchyLaplaceSquare RootLogistic
across all schedules
LinearCosineSigmoidExponentialCauchyLaplaceSquare RootLogistic